اتوماسیون
تحویل قطعی پروژه نوارنقاله های فولادمبارکه
امضای صورتجلسه تحویل قطعی پروژه نوارنقاله های کارخانه فولادمبارکه اصفهان
Board of Directors
Down By Subsidiary Company
- Fabrication of 9 set burner (flare) Amag design
- Design, Construction and erection and of one reserve tank of Amine (refinery gas KHANGIRAN).
- Fabrication of steel Structure of 4th Aromatic unit (petrochemical of Maron)
- Design and Construction of 3 Spherical tanks for 7th olephin unit (petrochemical Maron)
- Design and Construction 2 burner (Flare)for 7th olephin unit petrochemical Maron
- Fabrication of steel Structure of PET unit 2 (petrochemical Tond Goyan )
- Fabrication of steel Structure of Acid Acetic unit (Petrochemical fan Avaran)
- Construction and erection of NGL1200 and 1300
- Oil and Petrochemical Fabrication of offsite of burner (off sit Flare) for 6th Olephin unit (Petro Chemical Amir Kabir)
- Fabrication of 4 high Pressure tank for NGL 1200 and 1300
تماس با ما
دفترمرکزی:
تهران خیابان آفریقا بالاتر از بزرگ راه همت کوچه ناوک پلاک 6
کدپستی: 1518634531
تلفن های تماس:
88208810 -21 -98+
88208812 - 21 -98+
88208813 -21 -98+
88887087 -21 -98+
88887088 -21 -98+
فکس:88777331-21-98+
پست الکترونیک: This email address is being protected from spambots. You need JavaScript enabled to view it.
فرم رضایتمندی












